M a r k e t N e w s

Construction of Koysha hydropower dam in Ethiopia 39% complete

Posted on : Tuesday , 20th October 2020

The construction of 2,160MW Koysha hydropower dam in Ethiopia is 39 per cent complete. The dam is the fourth hydropower project under construction on Omo River.

Dr Seleshi Bekele, Minister of Water, Irrigation and Energy, stated that the construction works at the dam are progressing well. "This project shows how our country Ethiopia is utilizing its water resources for a sustainable development and to improve the livelihoods of its citizens," he mentioned during his visit to the construction site alongside the Executive Secretary of the UN Economic Commission for Africa (ECA) Dr. Vera Songwe.

Apart from the Koysha hydropower dam, the two officials also visited the 1,870MW Gibe III hydroelectric plant on the same river. Dr Seleshi, lately publicized plans to fully electrify the country by 2025. More than 65 per cent of Ethiopians have no access to electricity. The country is building the Grand Ethiopian Renaissance Dam (GERD) on Abay River to drive forward its economy by improving access to electricity.

Source : www.akds.com
Featured Companies
  • dubaiexporters.com

Complete List  

Advertisers in previous issue:

  • BITZER ranks among the leading manufacturers of refrigerant compressors.
  • IAC understand your system requirements, and can offer valuable input, be it design, consulting, training, or technical support.
  •  SOVEMA is the worldwide leading supplier of machinery for lead-acid battery production.
  • Manufacturer of heavy duty machinery
  • Catering for the most varied industrial storage requirements.
  • Pumping solutions, a technological potential.
  • Manufacturer & Trader of coil winding machines, toroidal coil winding machines, wire bunching machines, complete winding solution
  •  JS Electromec Ltd,(JSE Ltd) are registered Electrical contractors and Suppliers of Lighting and Power solutions for residential, commercial and industrial applications in Tanzania.
  • Sonmez Makina Ltd. is a manufacturer and exporter company for filling systems of domestic use LPG cylinders.
  • From a modest beginning in 1955, the IGP Group today provides over 50 products and services to the core sector.
  • Kenya Engineer is a Journal of the Institution of the Engineers of Kenya
  • Save your power bill by instaling servo voltage stabilizer.
  • Manufacturing and marketing "aira" brand Valve Automation Products
  • Ravi Enterprise is a professionally managed organization, established as a reliable source of industrial heaters.
  • All type conveyor belts for internal & external location tapis roulant de tout genre pous deplacement a l
  • Manufacturer of extrusion lines,extruders and down stream equipment.
  • Seco actively contributes to improving your productivity and competitiveness in metal cutting machining.
  • Chemicals,Environmental & Sewage,Treatment Laborotory;Equipments Analytical Equipments & Instraments;etc.
  • Hevt Duty Machinery
  • Air Conditioning Hire
  • Multi feedstock batch processing biodiesel equipment
  • GM Electricals is a competitive wholeseller of broad range of electrical materials and equipments
  • We have been at the forefront of plate heat exchanger technology.
  • At A J Charnaud & Co (Pty) Ltd we are committed to the safety & satisfaction of our customers
Afrotrade International Marketing, Tel: +971-50-6285684
© 1998-2026 Afrotrade