M a r k e t N e w s

Sh12bn project to end power outages – CS

Posted on : Wednesday , 10th August 2016

The construction of an alternative main power transmission line will restart soon and be complete by November to end nationwide power outages like the one experienced over the weekend.

The set up of the Sh2.64 billion, 400-kilovolts Suswa-Nairobi power line under the project will help address devastating and massive power outages, Energy Cabinet secretary Charles Keter has said.

The CS said the construction on the 100km Suswa-Isinya and the Isinya-Embakasi lines have restarted, after stalling for almost four years.

The project stalled after Kajiado residents demanded 100 per cent compensation as opposed to the 30 per cent average used by the government to acquire wayleaves.

 

“We have sat with Maasai leaders and agreed on the settlement. We have also agreed with the contractors to put up more teams, so by November we have the project complete,” Keter said yesterday during an aerial survey of the line by the ministry and its departments.

The project by the Kenya Electricity Transmission Company will provide an alternative transmission line for power from the Olkaria geothermal plant, currently the major supplier of power to the nation.

 

The current line runs from Olkaria to Suswa substation. It then gets into Nairobi through Nairobi North (Ndenderu)-Juja Road –Dandora then to Embakasi. The country presently depends on one main line, the 220KV line, which plunges the entire country into a blackout whenever there is a fault.

A technical hitch near Njiru area caused the countrywide blackout last Saturday, the third this year, after similar outages in January and June.

 

“In future we will not be having these outages. We don’t want to put our eggs in one basket. We will have an alternative route,” Principal secretary Joseph Njoroge said.

The new line will transmit up to 1000megawatts from Suswa to Nairobi.

Keter said the land issues that stalled the project have been solved and the Mombasa line will be complete by December.

“The line between Makueni and Rabai is complete the problem has been around Kiboko River in Kajiado,” he said.

“Kenyans must understand these projects are of national interest. If we continue this way we will never even have a road.”

The government has so far spent Sh2.6 billion to compensate 2,400 affected persons between Mombasa and Nairobi, Ketraco managing director Fernandes Barasa said yesterday.

Along the Suswa-Embakasi line, 1,600 people have been affected costing the government Sh2 billion in compensation.

Kenya Power CEO Ben Chumo said Sh10 billion has been set aside for maintaining power lines across the country.

“We have invested in new technology called live line maintenance where there is no shutting down of power. This has ensured minimum interruption,”” Chumo said.

Ketraco’s Suswa substation was energised on June 5, 2015, following successful pre- commissioning tests, enhancing the National Grid stability.

It is the largest substation in Kenya.

Source : www.the-star.co.ke
Featured Companies
  • dubaiexporters.com

Complete List  

Advertisers in previous issue:

  • Used Machinery
  • Dedicated to the Engineering Manufacturing Sector in India
  • Seco actively contributes to improving your productivity and competitiveness in metal cutting machining.
  • Producing numerous types of welding consumables and welding machines for both the domestic and international market
  • Worthington Products is the World’s most trusted name when it comes to providing quality waterway barriers for Debris Control, Dam Safety, Ice-Booms, Fish Guidance
  • Save your power bill by instaling servo voltage stabilizer.
  • Pumps for dewatering, ground water control, sludge and slurry handling.
  • Kenya Engineer is a Journal of the Institution of the Engineers of Kenya
  • Chemicals,Environmental & Sewage,Treatment Laborotory;Equipments Analytical Equipments & Instraments;etc.
  • Manufacturer refrigerated-type air dryer, desiccant air dryer and compressed air in-line filter.
  • Vrushabh is one of the leading manufacturer and distributor of Conveyor Belts, Transmission Belts, Elevator Belts, PVC Belts.
  •  Triveni Turbine Ltd. is a leading industrial steam turbine manufacturer, with a dominant market share of 58% in India.
  • Luminous Power Technologies Limited is a leading company with a differentiated portfolio of solutions for packaged power, diversified generation, electrical control & safety and energy optimization.
  • Engineering Expo, is India’s largest multi-location trade show on manufacturing
  • Pumping solutions, a technological potential.
  • Solarway is a forward thinking creative think tank that develops personalised and sustainable power solutions for people with limited or no access to power.
  • The trusted source for all your heavy  equipment needs!
  • Leading manufactures and expoters of the electronic products
  •  JS Electromec Ltd,(JSE Ltd) are registered Electrical contractors and Suppliers of Lighting and Power solutions for residential, commercial and industrial applications in Tanzania.
  • Prisma s.r.l. is an industrial reality, qualified in the study and the production of automatic doors for lift.
  • Catering for the most varied industrial storage requirements.
  • IAC understand your system requirements, and can offer valuable input, be it design, consulting, training, or technical support.
  • A world class Rotary Gear Pumps for effective pumping and trasfer of all viscous & semi-viscous liquid like oils, chemicals, food products and more..
  •  Magazine for Africa
Afrotrade International Marketing, Tel: +971-50-6285684
© 1998-2025 Afrotrade