M a r k e t N e w s

Construction of Koysha hydropower dam in Ethiopia 39% complete

Posted on : Tuesday , 20th October 2020

The construction of 2,160MW Koysha hydropower dam in Ethiopia is 39 per cent complete. The dam is the fourth hydropower project under construction on Omo River.

Dr Seleshi Bekele, Minister of Water, Irrigation and Energy, stated that the construction works at the dam are progressing well. "This project shows how our country Ethiopia is utilizing its water resources for a sustainable development and to improve the livelihoods of its citizens," he mentioned during his visit to the construction site alongside the Executive Secretary of the UN Economic Commission for Africa (ECA) Dr. Vera Songwe.

Apart from the Koysha hydropower dam, the two officials also visited the 1,870MW Gibe III hydroelectric plant on the same river. Dr Seleshi, lately publicized plans to fully electrify the country by 2025. More than 65 per cent of Ethiopians have no access to electricity. The country is building the Grand Ethiopian Renaissance Dam (GERD) on Abay River to drive forward its economy by improving access to electricity.

Source : www.akds.com
Featured Companies
  • dubaiexporters.com

Complete List  

Advertisers in previous issue:

  • Producing numerous types of welding consumables and welding machines for both the domestic and international market
  •  Ratan Projects & Engineering Co. Pvt. Ltd. is the flagship company of the Ratan
  • Pumps for dewatering, ground water control, sludge and slurry handling.
  • Lavorwash is a world-leader in manufacturing high pressure cleaners and vacuum cleaners for household and professional use.
  • Seco actively contributes to improving your productivity and competitiveness in metal cutting machining.
  • Used Machinery
  • Shenzhen City, Riland Industrial Co., Ltd. is China
  • KJV is a professionally managed group in distribution & transmission sector involved in executing contracts
  • Manufacturer of auxiliary equipments
  • Manufacturer refrigerated-type air dryer, desiccant air dryer and compressed air in-line filter.
  • Anya energy limited is accredited with ISO 9001 certification for Quality Management System and our products are recognized and certified by Bureau of Indian Standards
  • We offers high quality, Competitive price and satisfied service always
  •  ABL Machine Tools, One of the group companies of ABL India is India
  • EMI has a qualified and dedicated team of managers with vast experience in their respective areas of work.
  • All type conveyor belts for internal & external location tapis roulant de tout genre pous deplacement a l
  • Manufacturer & Trader of coil winding machines, toroidal coil winding machines, wire bunching machines, complete winding solution
  •  Triveni Turbine Ltd. is a leading industrial steam turbine manufacturer, with a dominant market share of 58% in India.
  •  JS Electromec Ltd,(JSE Ltd) are registered Electrical contractors and Suppliers of Lighting and Power solutions for residential, commercial and industrial applications in Tanzania.
  • Chemicals,Environmental & Sewage,Treatment Laborotory;Equipments Analytical Equipments & Instraments;etc.
  • Industrial  machinery
  • Mini plants of toilet paper rolls production
  • Solarway is a forward thinking creative think tank that develops personalised and sustainable power solutions for people with limited or no access to power.
Afrotrade International Marketing, Tel: +971-50-6285684
© 1998-2026 Afrotrade